Due to campus construction over the summer, the entrance to the Library has been rerouted to the North side of the building (near parking lot F) thru the small maintenance gate.
Way finding signs will be put in place before the start of the summer session.
All exit doors from Buildings 2000 and 2100 into the construction zone will be labeled as Emergency Exits Only.
The Library Staff will be sealing their main front sliding door to reduce the amount of dust and debris from entering the building. These doors will remain inoperable during construction. The doors on either side of the main door will become the Emergency Exits.